Geo Thermal Generator

From Satisfactory Wiki
Jump to: navigation, search
Geo Thermal Generator
Geo Thermal Generator.png
Can only be built on geyser nodes.
Generates electricity for your power grid.
Does not require any resources to be input.
Unlocked at Caterium Research - Geothermal Generator
Category Power
Subcategory Generators
Power Generated 200 MW
Fuel Geyser
Dimensions
Width 19 m
Length 20 m
Height 34 m
Required Items
Supercomputer.png
8
Heavy Modular Frame.png
16
High-Speed Connector.png
16
Copper Sheet.png
40
Rubber.png
80
Geyser
Geyser.png
Unlocked at Caterium Research - Geothermal Generator

The Geo Thermal Generator is a building that generates 200 MW of power when built on top of a Geyser. It requires no additional input, always operates and has priority over other sources of power (see below).

Obtaining[edit | edit source]

Unlocking[edit | edit source]

 Geo Thermal Generator is unlocked via the Caterium Research chain in the M.A.M..png M.A.M. using:
Supercomputer.png
50
Heavy Modular Frame.png
50
Rubber.png
300
 Geyser is added to the Resource Scanner via the Caterium Research chain in the M.A.M..png M.A.M. using:
Supercomputer.png
50
Heavy Modular Frame.png
50
Rubber.png
300

Construction[edit | edit source]

RecipeIngredientsBuildingProductsPrerequisites
Geo Thermal Generator
8 × Supercomputer.png
Supercomputer
 
16 × Heavy Modular Frame.png
Heavy Modular Frame
 
16 × High-Speed Connector.png
High-Speed Connector
 
Build Gun
1 × Geo Thermal Generator.png
Geo Thermal Generator
 
Caterium Research - Geothermal Generator
40 × Copper Sheet.png
Copper Sheet
 
80 × Rubber.png
Rubber
 
 

Geo Thermal Generators cannot be built on Geysers completely covered by Foundations. The Geyser's 'ring' has to be visible at the surface.

Usage[edit | edit source]

Each Geo Thermal Generator always produces power at its capacity regardless of power consumption.

There are 18 Geysers in total, which means a maximum of 3600 MW can be produced. Geo Thermal Generators cannot be overclocked, possibly because their GUI is unfinished.

Power generation priority[edit | edit source]

Power generated from the Geo Thermal Generators has priority over all other kinds of power generation. For example, if is 600 MW of power provided by Geo Thermal Generators, and additional power from Biomass Burners, Coal Generators and/or Fuel Generators, and the total power usage drops below 600 MW, all generators beside Geo Thermal Generators will stop operating and consuming fuel; the power will be provided solely by geothermal power. This makes the Geo Thermal Generators highly desirable, and it is advised to connect them into the power grid for maximum efficiency.

Trivia[edit | edit source]

  • Most Geysers are concentrated in the northern part of the map.
  • Each Geyser shoots out hot steam about every 20 seconds. The engineer is not damaged by this hot steam.
  • Most Geysers lack a hitbox and can be walked through.
  • Geysers are the only resource node that don't produce any items or liquids, and therefore don't allow the placement of Portable Miners on them.
  • Geo Thermal Generators can be only turned off by a power trip, as they lack a standby switch.

Gallery[edit | edit source]

History[edit | edit source]

  • Patch 0.3.3.1: Fixed a bug where some Geysers were still not usable
  • Patch 0.3.3.0: Geothermal Generators should be buildable on Geysers again
  • Patch 0.3.2.0: Updated and optimized the Geyser idle and burst VFX
  • Patch 0.3: Geysers now show just "Geyser" instead of "Geyser cannot be picked up! (Normal)" when approached
  • Patch 0.2.1.19: Geyser placement issue in Desert Canyons resulting in ‘Floor is too steep’ when trying to build should be fixed
  • Patch 0.1.5: Changed crafting costs from 25 Cable, 4 Heavy Modular Frame, and 20 Rubber to 30 Cable, 8 Heavy Modular Frame, and 50 Rubber
  • Patch 0.1.10: Fixed an invalid Geyser