Conveyor Lifts
Conveyor Lift Mk.1.png
Operation
Inputs 1
Outputs 1
Dimensions
Width 2m
Length 2m
Height 3m+vertical span
Mark Items per minute Resource cost
Mk.1 60  Iron Plate
Mk.2 120  Reinforced Iron Plate
Mk.3 270  Steel Beam
Mk.4 480  Encased Industrial Beam
Mk.5 780  Alclad Aluminum Sheet
Mk.6 1200  Alclad Aluminum Sheet
 Heat Sink

Conveyor Lifts are mechanisms that transport items vertically. They have 6 marks, just like Conveyor Belts. They cannot be used to transport anything other than items, and items cannot be picked up from them. They can be directly connected to a belt connector on machines, such as Miners or Constructors.

Its rotation can be changed by scrolling. Use mouse movement to change its height - it can go up or down in increments of 1 meter. The minimum vertical distance is 4 meters and the maximum is 48 meters. Similar to Conveyor Belts, Conveyor Lifts can be upgraded in-place, which will return the contained items.

Construction[edit | edit source]

The building of lift always starts with its starting point and ends with its ending point.

  • To build an upward lift, click on the floor, or snap to any existing machine, belt or splitter output. Move your mouse UPWARD to adjust the height. Use the mouse wheel to rotate the output direction then click AGAIN to confirm.
  • To build a downward lift, snap to any existing machine, belt or splitter input. Move your mouse DOWNWARD to adjust the height. Use the mouse wheel to rotate the output direction then click AGAIN to confirm.
  • If you want to build a top-down lift, near the edge of the cliff or foundation, build a conveyor pole there, then snaps the lift to it and pull downward.
  • The height of one lift is limited to 48 meters, however, multiple lifts can be attached to each other, allowing for theoretically infinitely tall lift chains.

Marks[edit | edit source]

There are currently 5 marks of Conveyor Lifts available in the game:

Conveyor Lift Mk.1
Conveyor Lift Mk.1.png
Transports up to 60 resources per minute. Used to move resources between floors.
Unlocked at Tier 1 - Logistics
Category Logistics
Subcategory Conveyor Lifts
Dimensions
Width 2 m
Length 2 m
Height (4-50) m
Required Items
Iron Plate.png
2
Conveyor Lift Mk.2
Conveyor Lift Mk.2.png
Transports up to 120 resources per minute. Used to move resources between floors.
Unlocked at Tier 2 - Logistics Mk.2
Category Logistics
Subcategory Conveyor Lifts
Dimensions
Width 2 m
Length 2 m
Height (4-50) m
Required Items
Reinforced Iron Plate.png
2
Conveyor Lift Mk.3
Conveyor Lift Mk.3.png
Transports up to 270 resources per minute. Used to move resources between floors.
Unlocked at Tier 4 - Logistics Mk.3
Category Logistics
Subcategory Conveyor Lifts
Dimensions
Width 2 m
Length 2 m
Height (4-50) m
Required Items
Steel Beam.png
2
Conveyor Lift Mk.4
Conveyor Lift Mk.4.png
Transports up to 480 resources per minute. Used to move resources between floors.
Unlocked at Tier 6 - Expanded Power Infrastructure
Category Logistics
Subcategory Conveyor Lifts
Dimensions
Width 2 m
Length 2 m
Height (4-50) m
Required Items
Encased Industrial Beam.png
2
Conveyor Lift Mk.5
Conveyor Lift Mk.5.png
Transports up to 780 resources per minute. Used to move resources between floors.
Unlocked at Tier 7 - Bauxite Refinement
Category Logistics
Subcategory Conveyor Lifts
Dimensions
Width 2 m
Length 2 m
Height (4-50) m
Required Items
Alclad Aluminum Sheet.png
2

Unreleased[edit | edit source]

There is one unreleased Conveyor Lift mark planned for future updates.

Conveyor Lift Mk.6
128x128px
Transports up to 1200 resources per minute. Used to move resources between floors.
Unlocked at Tier 8
Category Logistics
Subcategory Conveyor Lifts
Dimensions
Width 2 m
Length 2 m
Height (4-50) m
Required Items
Alclad Aluminum Sheet.png
1
Heat Sink.png
1

Note: Unlike the Conveyor Belt Mk.6, Conveyor Lift Mk.6 never appeared in public builds of the game. Its existence and capacity is confirmed by translation strings.[1]

Connectivity[edit | edit source]

To check a Conveyor Lift's connectivity, look at the shape of its flexible connectors:

Blue: The connector flexes out, indicating it is connected. Red: The connector retracts, showing no connection
  • The Conveyor Lift must be built after the structure it is connected to. For example, building a Conveyor Splitter after building the lift will not work.
  • Conveyor Lifts can be built in-between a Splitter and a machine (eg, Assembler) directly, without the need for a short belt, provided the distances in-between are correct. The Nuclear Power Plant is an exception, as the input and output are both offset by half a meter in relation to foundation grids, making it impossible to align the gap with Splitters. A short belt is required in this case.
  • The starting point of the lift snaps to an existing Belt, but the ending point does not ("Encroaching others clearance"). In either case, the flexible connector appears to be retracted.

Trivia[edit | edit source]

  • There are flexible connectors with the length of 1 meter which extend out at both ends.
  • Once the Jetpack is unlocked, the engineer can utilize the Conveyor Lifts to gain access to height quickly, much faster and also cheaper than using a ladder: build chains of Conveyor Lifts Mk.1, each segment should cost about 22 Iron Plates.
  • Power Poles can be placed on the end segments of lifts.

Gallery[edit | edit source]

History[edit | edit source]

References[edit | edit source]

See also[edit | edit source]